Lane schedule

Sailing schedules from Cai Mep to Alexandria

MSC, COSCO, Maersk, Hapag-Lloyd run 4 sailings a week from Cai Mep to Alexandria, with transit of 21 to 40 days. Here is what to settle before you book.

Next sailing
Thu 26 Nov
Fastest transit
21 days
Frequency
4 sailings/week
Carriers
MSCCOSCOMaerskHapag-Lloyd

Departures

Upcoming sailings

Get a quote
  • MSCMSC Martina MariaQB644W · BRITANNIADeparture (ETD): Thu 26 NovArrival (ETA): Tue 05 Jan40 days2 transshipmentsSign in
  • COSCOCscl Mercury101W · AEM3Departure (ETD): Mon 30 NovArrival (ETA): Wed 30 Dec30 days1 transshipmentSign in
  • MSCMSC UgandaGU646W · AMERICA SERVICEDeparture (ETD): Wed 02 DecArrival (ETA): Tue 05 Jan34 days2 transshipmentsSign in
  • MaerskMerkur Archipelago649SDeparture (ETD): Thu 03 DecArrival (ETA): Thu 07 Jan35 days2 transshipmentsSign in
  • COSCOCOSCO Shipping Sakura037W · AEM3Departure (ETD): Sat 05 DecArrival (ETA): Wed 06 Jan32 days1 transshipmentSign in
  • MSCMSC VancouverGU647W · AMERICA SERVICEDeparture (ETD): Sun 06 DecArrival (ETA): Tue 05 Jan30 days2 transshipmentsSign in
  • MSCMSC BariFY646A · AFRICA EXPRESSDeparture (ETD): Mon 07 DecArrival (ETA): Tue 05 Jan29 days2 transshipmentsSign in
  • MaerskPorto Cheli650SDeparture (ETD): Mon 07 DecArrival (ETA): Thu 14 Jan38 days2 transshipmentsSign in

First 3 sailings previewExcludes local chargesFinal rate at booking

MSC checked on 23 NovCOSCO checked on 15 NovMaersk checked on 23 NovHapag-Lloyd checked on 23 NovConfirm at booking

Lanes from Cai Mep

Ocean freight rates from Cai Mep to Alexandria

Sign in or create an account to see carrier rates for this route.

Sign in
Contents

Sailings, origin and destination

Maersk's current schedule for this lane shows two transshipments, first at Tanjung Pelepas and then at Port Said East. Transit takes 21 to 40 days, with 4 sailings a week operated by MSC, COSCO, Maersk, Hapag-Lloyd. These figures are port to port. They exclude cargo preparation, customs clearance and inland haulage.

Cargo departs from CMIT at Cai Mep, not Cat Lai. Trucks must deliver containers to CMIT for gate-in. Check the terminal and CY on the booking, along with the cut-off for SI and VGM. At the destination, AICT operates two separate terminals, Alexandria and El Dekheila, so the booking must name the right discharge terminal.

ACID and documents before loading

The Egyptian importer must hold an ACID on Nafeza before cargo is loaded. The exporter should check its CargoX account and send documents through it. The invoice, packing list, draft B/L, HS code and party details must match word for word. Submitting the final document set is a separate step and does not mean the ACID has been approved. Ask the importer and the carrier which deadline applies to your shipment.

GOEIC, duties and origin

GOEIC requires registration of the factory or brand owner, but only for regulated product categories. The importer should check the product, the HS code and whether the registration is still valid. According to the Ministry of Industry and Trade's list (MOIT VNTR), Vietnam and Egypt have no FTA in force. Zero duty cannot be promised. Buyers should check duties by HS code, along with the origin documents required.

Sokhna, Alexandria and schedule risk

Sokhna sits on the Red Sea, Alexandria on the Mediterranean. The Maersk schedule we checked shows no sailing to Sokhna. That does not prove the port is closed or that every carrier has stopped calling, and a schedule does not explain why. A call at Port Said does not mean the vessel transits the Suez Canal, so ask the carrier for the actual routing. For Tet, Ramadan and Eid, plan around factory and consignee holidays. Do not assume a fixed seasonal delay.

Destination charges and how Homexim helps

Ask for a quote that itemizes every charge that applies: THC, D/O, storage, DEM/DET and free time, clearance and inspection, and inland transport. Storage, container detention and duties are separate charges. Who pays depends on the Incoterms and the contract.

Homexim handles FCL and LCL, export clearance and trucking in Vietnam. Each shipment gets a dedicated contact, and quotes break out every charge. Import clearance in Egypt is handled by the consignee or its agent. For a quote, send the HS code and cargo type, container count or CBM, cargo-ready date and destination terminal.

FAQ

FAQ

How long does the voyage take?

21 to 40 days port to port, excluding preparation, clearance and inland haulage.

Is there a direct sailing?

No. The current Maersk schedule shows two transshipments, at Tanjung Pelepas and Port Said East.

Who applies for the ACID?

The Egyptian importer, on Nafeza, before cargo is loaded.

Does AICT have one terminal or several?

Two. AICT operates Alexandria and El Dekheila separately, and the booking must name the correct one.

Do Vietnam and Egypt have an FTA?

None is in force. Buyers should check duties by HS code.

Sources (5)
  1. Nafeza: Advance Cargo Information System
  2. GOEIC: Factories Registration
  3. Vietnam Ministry of Industry and Trade: Free Trade Agreements
  4. AICT: Terminals Locations
  5. Hutchison Ports: Our Ports

Need a quote for Cai Mep to Alexandria?

Lane pre-filled, Homexim replies the same business day

Get a quote
Request a quote